Printed walls as a defined subcontract: engineered, insured, and sequenced into your critical path.
Wallr prints the wall package as a defined scope: engineered, insured, and sequenced into your critical path. A print crew of two to three replaces weeks of framing labor exposure, and the corduroy shell hands off cleanly to your trades.
First 3DCP job? Start with a pilot. An ADU or small single family to verify 3DCP produces better outcomes than your current process(es).
Machine mobilization, printable material, print crew, embeds and tie beam, and QC documentation. Slab, roof, MEP, openings, and finishes stay with your trades.
Walls print in days once the slab cures. We sequence around your inspections and keep the site usable: one machine footprint, no formwork laydown, no framing package on the ground.
The printed wall system is delivered under an engineered design by a licensed engineer, coordinated with your engineer of record. You get stamped drawings, not promises.
The wall scope is delivered as an insured subcontract with QC documentation per lift. Specifics are spelled out in the subcontract, in writing, before mobilization.
Very little. Keep the slab clear during print days, then treat the shell like a very straight, very solid wall: your openings, roof, and trades proceed as planned.